Process Engineering Control & Manufacturing Magazine (PECM) The number one Industrial engineering magazine

Saving costs means more profit

Why do so many people ignore or resist possibilities to save costs, make more profit, and reduce emissions?. Sometimes company buyers reject saving possibilities because the cost could be more...

Zimmer Group: Automation Specialists

Zimmer Group Ltd was established in 1980 in Rheinau-Freistett by brothers, Martin and Günther Zimmer. With the company’s HQ based in Germany, Zimmer Group specialize in the manufacturing of automation...

Pem Automation Ltd

Operating from a manufacturing facility in Mullingar, Co. Westmeath, Pem Automation has been designing and manufacturing capital equipment for 40 years. Originally founded in 1978, the company has grown from being a...

Fulfilment Distribution Centre Solution

Engineers at modern fulfilment centres are required to maintain material handling equipment, conveyors and packaging machinery to ensure their smooth running and full-time operation. Awkward and restricted access areas present...

IDEM Safety Switches

SKORPION – Trapped Key Interlocking with Key Exchange Designed and manufactured in the United Kingdom, Skorpion, IDEM’s Trapped Key System has been developed to provide extremely robust mechanical coded key...

Lamonde Automation Ltd

Integrating miscellaneous factory automation equipment is rarely an easy task since often each machine uses a different controller. When integrating with other IT systems, the variety of protocols often presents...

Selco’s ECAP

Selco’s ECAP series electronic temperature controller uses NTC thermistors, J- or K- type thermocouples, and/or RTD sensors to control up to 2 relay outputs. The controller is supplied in an...

Monmouth Scientific introduce Cleanroom Kits

Cleanroom Kits is the new, cost effective Modular Cleanroom concept from Monmouth Scientific, designed to save customers time and money. Entirely designed & manufactured by our experienced design and production...

Saving with more performance

Dealing with the tower they were rejecting our offer because the cost of our grease was about $700 more than what they had been using, which lasted only 3 years.